X
- West Kowloon Terminus Station SouthShow Full Screen
- West Kowloon Terminus Station SouthShow Full Screen
- West Kowloon Terminus Station SouthShow Full Screen
- West Kowloon Terminus Station SouthShow Full Screen
Multi-Storey 380,000 square metre train terminal designed by Aedas in collaboration with AECOM. This rail terminus of the Hong Kong section of the Guangzhou–Shenzhen–Hong Kong Express Rail Link (XRL) was constructed by the MTR Corporation & Laing O' Rourke-Hsin Chong- Paul Y. Joint Venture.
The M24 x 90 TCBs were supplied via JAM Bolts the Hong Kong distributer for Tension Control Bolts Ltd.
Transport