Wind Energy
As state subsidies are being reduced and eliminated in the wind energy market the challenge for wind turbine tower manufacturers is that they are continuously required to reduce the cost price per kWh of wind energy. To meet this challenge taller bolted shell towers are erected which significantly increases the energy yield of a wind turbine generator on sites with a high wind shear. Our Greenkote® TCBs are being integrated into the new tower designs below.
-
MATHIS SAS Timber & Steel Framed Towers
TCBs have recently been installed in 3 newly built wooden wind turbines in Châteauvillain, North-Eastern France..
-
Lagerwey Modular Steel Tower
Lagerwey is a Dutch manufacturer of direct drive wind turbines now owned by....
-
Siemens Gamesa - Bolted Steel Shell Tower
This conceptually innovative tower design developed by Siemens, Andresen....
Wind Energy