TCB Studs for Bank Station Capacity Upgrade (BSCU)

Bank Station
TCB Studs for steel trusses at the Bank Station Capacity Upgrade (BSCU)

Over 2,000 M30 TCBs and TCB Studs have been installed by Inter-Steels Ltd in support of Bank Station Capacity Upgrade (BSCU) in London.

The new station entrance is located in King William Street, and a new platform and tunnel for Northern line is being constructed below ground, but above Docklands Light Railway tunnels.

Tension Control Bolts Ltd are pleased to play our part in the station upgrade with installation training on site provided to the erection crew, as well as to the main contractor Dragados.

The Bank and Monument London underground stations are used by more than 52 million passengers each year.